Achievements

Proven Performance. Measurable Results.

A detailed account of project scope, challenges, technical execution, and outcomes highlighting WWG Engineering’s commitment to performance, safety, and engineering integrity.

FEED WATER PREHEATER PUMP OVERHAULING REPORT

WWG Engineering has worked with Sembcorp to overhaul their feed-water preheater Apollo pump.

INCOMING CONDITION AND DISMANTLING

The process began with the dismantling of parts followed by a dimension and run out check. A bore check is done on the impeller and a dimension check is done on the wear ring. Masking and blasting is then carried out, as well as coating.

MASKING & BLASTING

To complete the task, a combination of techniques such as blasting, welding and machining were carried out by our team on the top sheaves.

PRIMER COATING (ONLY FOR EXTERNAL PAINTING)

To complete the task, a combination of techniques such as blasting, welding and machining were carried out by our team on the top sheaves.

EXTERNAL COATING RAL6019 PASTEL GREEN AS PER OEM SPECIFICATION

INTERNAL COATING USING CERAMIC POLYMER CN200

Finally, the reassembly is done with new consumables, ending with a pressure test.

PRESSURE TESTING MAX SUCTION PRESSURE = 5 BAR REQUIRED TESTING PRESSURE = 5 BAR X 1.5 = 7.5 BAR