Achievements
Proven Performance. Measurable Results.
A detailed account of project scope, challenges, technical execution, and outcomes highlighting WWG Engineering’s commitment to performance, safety, and engineering integrity.
DRIVE TRAIN OVERHAUL AND REPAIR
WWG Engineering received a project in the form of Drive Train Overhaul and Repair which involved an overhaul service done on both the input and output shaft of the reduction gearbox.
INCOMING CONDITION REDUCTION GEAR INPUT SHAFT
WWG Engineering received a project in the form of Drive Train Overhaul and Repair which involved an overhaul service done on both the input and output shaft of the reduction gearbox.
OVERHAUL SERVICE REDUCTION GEAR INPUT SHAFT
This involved the disassembly of the shafts and their components, followed by inspection and calibration and the repair processif required to ensure that the end products are satisfactory to the client’s needs.


























